Hesse BESS

A 7 MW / 16.7 MWh containerized battery storage system described as operational since 2024 in the legacy project record.

Hesse, Germany

Battery storage equipment at the Hesse project site

Project portfolio

Project facts

Rated power
7 MW
Energy capacity
16.7 MWh
System
Four liquid-cooled LFP battery containers
Power conversion
One 7 MW PCS-MV skid with integrated 20 kV transformer
Reported availability
Above 98% in the legacy publication; measurement period and method were not stated
01

Challenge

Translate a compact containerized architecture into an operating asset with aligned battery, PCS, medium-voltage, and market-use interfaces.

02

Approach

The published configuration combines four liquid-cooled LFP containers with a single medium-voltage power-conversion skid and integrated transformer.

03

Published status

The asset is described as serving primary frequency regulation and peak-shaving applications. The legacy publication's availability figure is retained only with an explicit evidence limitation.

Sunft

Sunft's role

Technical development, financing, procurement, and operations and maintenance as stated in the legacy project record.

Scope

Scope described

  • Technical project development
  • Financing and procurement
  • Operations and maintenance

Project portfolio

Published timeline

  1. 2022

    Planning started

    Start of technical development in the published project record.

  2. 2024

    Operations

    Described as operational since 2024 in the legacy record.