Challenge
Coordinate two asset classes, separate project companies, and a common high-voltage connection without obscuring technical and commercial interfaces.
Project portfolio
A 30 MWp photovoltaic project with an integrated battery storage concept and a shared high-voltage grid connection.
Saxony, Germany

Project portfolio
Coordinate two asset classes, separate project companies, and a common high-voltage connection without obscuring technical and commercial interfaces.
The project record describes a shared handover substation intended to reduce duplicated grid-connection infrastructure while retaining separate solar and storage structures.
The legacy publication named 2026 for construction and 2027 for commissioning and grid connection. These are planning milestones, not a confirmation of current completion status.
Sunft
Project development and technical structuring of the hybrid concept and grid connection.
Scope
Project portfolio
Development on a municipal site began.
Planned in the legacy project record; current status requires confirmation.
Planned milestone in the legacy project record.