Project portfolio

Saxony solar + BESS hybrid project

A 30 MWp photovoltaic project with an integrated battery storage concept and a shared high-voltage grid connection.

Saxony, Germany

Aerial view of the Saxony solar and battery storage project with its substation

Project portfolio

Project facts

PV capacity
30 MWp
Storage concept
Integrated BESS; capacity not publicly stated
Grid connection
New 33/110 kV substation to the MITNETZ STROM high-voltage network
Project structure
Solar and BESS in separate project companies with a shared handover substation
01

Challenge

Coordinate two asset classes, separate project companies, and a common high-voltage connection without obscuring technical and commercial interfaces.

02

Approach

The project record describes a shared handover substation intended to reduce duplicated grid-connection infrastructure while retaining separate solar and storage structures.

03

Published status

The legacy publication named 2026 for construction and 2027 for commissioning and grid connection. These are planning milestones, not a confirmation of current completion status.

Sunft

Sunft's role

Project development and technical structuring of the hybrid concept and grid connection.

Scope

Scope described

  • Site and project development since 2021
  • Hybrid PV and BESS structuring
  • 33/110 kV grid-connection concept

Project portfolio

Published timeline

  1. 2021

    Development started

    Development on a municipal site began.

  2. 2026 plan

    Construction window

    Planned in the legacy project record; current status requires confirmation.

  3. 2027 plan

    Commissioning and grid connection

    Planned milestone in the legacy project record.