Assess

Technical Due Diligence

Structure technical evidence, surface material risks, and make open points decision-ready.

For
Developers, investors, and lenders
Project stage
Assess

Questions and risks

  • Unclear technical assumptions
  • Incomplete cell and aging evidence
  • Missing system-integration analysis
  • Unverified digital-interface performance

Scope of work

  • Cell, system, and design evidence review
  • Thermal, protection, and interface assessment
  • Decision-focused technical reporting

Concrete deliverables

  • Technical risk register
  • Open-points log
  • Due-diligence report

Assess

Working process

  1. 01

    Define the decision context

  2. 02

    Review available evidence

  3. 03

    Test material assumptions

  4. 04

    Report findings and actions

FAQ

Frequently asked questions

What makes a review decision-ready?

Findings are linked to evidence, consequence, ownership, and a clear next action.

Relevant verified projects

Relevant verified projects

Aerial view of the Saxony solar and battery storage project with its substation
Saxony, GermanyDevelopment — schedule from the legacy project record

Saxony solar + BESS hybrid project

A 30 MWp photovoltaic project with an integrated battery storage concept and a shared high-voltage grid connection.

View project
Battery storage equipment at the Hesse project site
Hesse, GermanyOperational since 2024 — legacy record

Hesse BESS

A 7 MW / 16.7 MWh containerized battery storage system described as operational since 2024 in the legacy project record.

View project
Aerial view of the battery storage site and substation in Mecklenburg-Vorpommern
Mecklenburg-Vorpommern, GermanyIn development since 2024 — legacy record

Pasewalk grid-scale BESS

A planned grid-scale battery storage project in north-eastern Germany with a proposed route to a 380 kV substation.

View project